The church I attend was in the path of Hurricane Sandy in November, 2012. The four storefronts that we rent were submerged in water, filling the crawl space and leaving about 10 inches of standing water in the main auditorium. We had to gut the flooring and much of the walls, and remodel everything. Though I didn’t do all of the work myself, I was very involved in the remodel and reconstruction process.
BEFORE:
AFTER:
No comments:
Post a Comment